Home › Electricity Meters and Smart Electricity Submetering Bruntab Energy Electricity Meters and Smart Electricity Submetering Bruntab single- and three-phase submeters measure tenants, units, common areas, equipment, and production loads and transfer readings to EEMS for monitoring and tariff-based billing. Electricity Meters and Smart Electricity Submetering Bruntab single- and three-phase submeters measure tenants, units, common areas, equipment, and production loads and transfer readings to EEMS for monitoring and tariff-based billing. What is an electricity meter?An electricity meter records electrical energy, normally in kilowatt-hours. The utility’s main meter is the official billing point for a property. A downstream submeter measures one unit, tenant, circuit, machine, department, or common-area load so its share can be monitored and allocated internally. Installation and Bruntab billingA qualified electrician installs the correct meter after reviewing phase configuration, voltage, maximum current, conductor size, panel space, protection, and communication requirements. Bruntab readers collect the meter registers by an approved data interface and send them to EEMS. The platform provides trends, reports, alarms, and separate rial-based sub-bills using the configured electricity tariff and progressive tiers. Electrical installation, isolation, protection, current-transformer orientation, earthing, and commissioning must follow the meter manual and applicable electrical rules. Metering equipment should never be installed or rewired by unqualified persons. Applications Apartment, office, and shop submeteringCommercial centers and mixed-use buildings Common-area electricity and EV-charging allocationIndustrial production lines and departments HVAC plants, pumps, chillers, and major equipmentTemporary users, contractors, and leased areas Power-quality and demand-management projects when supported by the selected meter Benefits Fair allocation based on measured kWhAutomatic remote readings without manual transcription Hourly and daily load profilesPeak-demand and abnormal-use visibility High-consumption user identificationEvidence for efficiency projects and maintenance Integration with EEMS reports and billing Bruntab electricity-meter types Single-phase miniature meter with data outputDesigned for compact distribution boards and single-phase branch circuits. Model selection must match voltage, direct-current rating, accuracy, pulse or communication output, and panel mounting. Single-phase wiring and reader connectionThe incoming and outgoing phase and neutral conductors are connected only as specified by the manufacturer. The data output is wired separately to the reader with correct polarity and cable type. The circuit must be isolated before work and verified during commissioning. Three-phase meter with data outputThree-phase meters serve larger units, commercial users, common loads, and industrial equipment. Available measurements may include active energy, reactive energy, demand, voltage, current, power factor, and other power-quality parameters. Direct and current-transformer connectionsA direct-connected meter carries load current through its terminals and is selected for the approved current range. Higher-current systems use current transformers (CTs); correct CT ratio, class, polarity, and secondary safety are essential for accurate readings. Three-phase wiring and reader connectionPhase sequence, voltage references, CT polarity, meter configuration, and the Modbus/RS-485 or pulse interface are checked against the approved drawing. Commissioning compares meter values with an independent reference and verifies data at EEMS. Typical project workflow Survey panels, loads, tariffs, and billing requirements.Prepare the single-line and communications design. Select meters, CTs, protection, enclosures, and readers.Install during an approved electrical shutdown. Test phase sequence, ratios, direction, communications, and recorded values. Configure EEMS users, reports, alarms, and billing rules. Frequently asked questions Does a submeter replace the utility meter?No. It is used for internal measurement and allocation unless the utility formally approves it as a billing meter. Can a separate bill be issued for each tenant?Yes. EEMS can allocate the main cost according to measured energy and the agreed tariff rules. Can meters be read remotely?Yes. Compatible pulse or digital outputs connect to Bruntab readers for automatic collection. How is the correct meter selected?Selection considers single/three phase, direct or CT connection, current, voltage, accuracy, required parameters, protocol, enclosure, tariff, and installation conditions. Talk to Bruntab Energy For technical advice, site assessment, system design, and a project quotation, contact the Bruntab Energy engineering team. Request a consultation
Electricity Meters and Smart Electricity Submetering Bruntab single- and three-phase submeters measure tenants, units, common areas, equipment, and production loads and transfer readings to EEMS for monitoring and tariff-based billing. What is an electricity meter?An electricity meter records electrical energy, normally in kilowatt-hours. The utility’s main meter is the official billing point for a property. A downstream submeter measures one unit, tenant, circuit, machine, department, or common-area load so its share can be monitored and allocated internally. Installation and Bruntab billingA qualified electrician installs the correct meter after reviewing phase configuration, voltage, maximum current, conductor size, panel space, protection, and communication requirements. Bruntab readers collect the meter registers by an approved data interface and send them to EEMS. The platform provides trends, reports, alarms, and separate rial-based sub-bills using the configured electricity tariff and progressive tiers. Electrical installation, isolation, protection, current-transformer orientation, earthing, and commissioning must follow the meter manual and applicable electrical rules. Metering equipment should never be installed or rewired by unqualified persons. Applications Apartment, office, and shop submeteringCommercial centers and mixed-use buildings Common-area electricity and EV-charging allocationIndustrial production lines and departments HVAC plants, pumps, chillers, and major equipmentTemporary users, contractors, and leased areas Power-quality and demand-management projects when supported by the selected meter Benefits Fair allocation based on measured kWhAutomatic remote readings without manual transcription Hourly and daily load profilesPeak-demand and abnormal-use visibility High-consumption user identificationEvidence for efficiency projects and maintenance Integration with EEMS reports and billing Bruntab electricity-meter types Single-phase miniature meter with data outputDesigned for compact distribution boards and single-phase branch circuits. Model selection must match voltage, direct-current rating, accuracy, pulse or communication output, and panel mounting. Single-phase wiring and reader connectionThe incoming and outgoing phase and neutral conductors are connected only as specified by the manufacturer. The data output is wired separately to the reader with correct polarity and cable type. The circuit must be isolated before work and verified during commissioning. Three-phase meter with data outputThree-phase meters serve larger units, commercial users, common loads, and industrial equipment. Available measurements may include active energy, reactive energy, demand, voltage, current, power factor, and other power-quality parameters. Direct and current-transformer connectionsA direct-connected meter carries load current through its terminals and is selected for the approved current range. Higher-current systems use current transformers (CTs); correct CT ratio, class, polarity, and secondary safety are essential for accurate readings. Three-phase wiring and reader connectionPhase sequence, voltage references, CT polarity, meter configuration, and the Modbus/RS-485 or pulse interface are checked against the approved drawing. Commissioning compares meter values with an independent reference and verifies data at EEMS. Typical project workflow Survey panels, loads, tariffs, and billing requirements.Prepare the single-line and communications design. Select meters, CTs, protection, enclosures, and readers.Install during an approved electrical shutdown. Test phase sequence, ratios, direction, communications, and recorded values. Configure EEMS users, reports, alarms, and billing rules. Frequently asked questions Does a submeter replace the utility meter?No. It is used for internal measurement and allocation unless the utility formally approves it as a billing meter. Can a separate bill be issued for each tenant?Yes. EEMS can allocate the main cost according to measured energy and the agreed tariff rules. Can meters be read remotely?Yes. Compatible pulse or digital outputs connect to Bruntab readers for automatic collection. How is the correct meter selected?Selection considers single/three phase, direct or CT connection, current, voltage, accuracy, required parameters, protocol, enclosure, tariff, and installation conditions. Talk to Bruntab Energy For technical advice, site assessment, system design, and a project quotation, contact the Bruntab Energy engineering team. Request a consultation